For general whole house customization, if only a flat panel double-sided finish is used, the production time is approximately 30 to 45 days. If other processes are involved, such as glass, powder coating, or vacuum forming, the duration may be longer. Typically, production times are shorter in the first half of the year and may extend in the second half.
If you opt for a mixed oil finish, which refers to our paint application for items like doors and cabinets, the production time is relatively longer, usually around 2 months, as the paint requires adequate drying time.